Solar PV installation at The Police Treatment Centre 1

Solar PV installation at The Police Treatment Centre, Harrogate

Project

BTG Eddisons was appointed by The Police Treatment Centre in Harrogate to help reduce operational overheads and accelerate its journey toward net zero. With a legacy dating back to 1897, the Centre continues its mission of supporting injured and unwell police officers, and is now strengthening that commitment through sustainable, resilient operations.

Our Building & Project Consultancy team led the commission from the outset, undertaking a comprehensive feasibility study to assess the full range of renewable energy technologies suitable for the estate. Through detailed modelling and cost–benefit analysis, a bespoke solar PV solution emerged as the most effective option, delivering strong performance, excellent value for money, and clear alignment with the Centre's long-term sustainability objectives.

Approach

Following the feasibility stage, we managed a competitive procurement process and oversaw the entire delivery phase.

Working in a live clinical environment required meticulous planning and coordination. Our team worked closely with the Centre to schedule all activities around the safety and wellbeing of patients and staff, with works completed outside core hours and supported by clear, consistent communication throughout.

The completed 125 kWp solar PV installation spans five buildings and ten roof faces, maximising on-site generation across the estate. As part of the works, we liaised with the Distribution Network Operator (DNO) to secure G99 approval and installed an export power management system, providing the Centre with real-time monitoring of solar generation and grid consumption.

The project was delivered on time, within budget, and to a high standard of workmanship.

Results

The solar PV system generates 105,000 kWh of renewable electricity each year, reducing annual carbon emissions by around 48,000 kg. Financially, the Centre is now achieving operational savings of approximately £5,000 per month, strengthening its long-term resilience and supporting progress against its net zero roadmap.

For The Police Treatment Centre, the benefits extend beyond cost savings, enabling more resources to be focused on what matters most: providing dedicated care and recovery support for officers across the UK.

"Working with BTG Eddisons has been an exceptionally positive experience. Their team guided us through every stage of the project with clarity, expertise, and genuine understanding of our operational needs. The solar PV installation has already delivered significant financial and environmental benefits, helping us strengthen the long-term resilience of the Centre. We are delighted with the outcome and grateful for the support BTG Eddisons provided throughout."

Janine Green
Centre Manager

Why do clients choose BTG Eddisons for decarbonisation and solar PV projects?

When you need expert decarbonisation support, BTG Eddisons combines technical expertise with practical, end-to-end delivery. With over 180 years of industry experience and a proven track record of success, we are a trusted partner for organisations seeking to reduce carbon emissions and lower operational costs.

Some other reasons clients choose us:

  • We are RICS-certified, ensuring we meet strict industry standards
  • We are highly rated by past clients
  • We combine local knowledge with national coverage across 35 offices throughout the UK
  • We manage every stage of your project, from feasibility and procurement through to delivery and commissioning

Get expert decarbonisation advice today

If you are looking to reduce energy costs and progress your net zero objectives, our building consultancy specialists are here to help. Use the form below to arrange a free consultation.

Solar PV installation at The Police Treatment Centre 1

BTG Eddisons delivers 125 kWp solar PV installation at The Police Treatment Centre, Harrogate

Get in touch with the BTG Eddisons team

Please contact us for more details and information.

Related reading

View All
Construction project management for new co-op store near Spalding
IMG_8610 scaled

Building consultancy

Retail

Construction project management for new co-op store near Spalding

Riverside Primary Academy improvement works
riverside 1687

Building consultancy

Education

Riverside Primary Academy improvement works

Parkside Academy Refurbishment
Parkside After

Building consultancy

Education

Parkside Academy Refurbishment

Demolition and Site Clearance for University of Bolton
huddersfield_uni_1920x450

Building consultancy

Education

Demolition and Site Clearance for University of Bolton

Meet the team
CTA grid   Our Team

Our team

We are proud to employ more than 550 talented individuals working across a multitude of disciplines.

Find your nearest office
uk map dotted orange

Office finder

BTG Eddisons is rapidly growing; emphasised by our nationwide network of 35 offices across the UK.

Get in touch with us
CTA grid   Contact Us

Contact us

We are ready to take your call and can quickly pass you through to the right department.

Sign up to our newsletter
CTA grid   Newsletter

Newsletter

Join thousands of property managers, occupiers, landlords and investors receiving the latest insights.

This site uses cookies to monitor site performance and provide a more responsive and personalised experience. You must agree to our use of certain cookies. For more information on how we use and manage cookies, please read our Privacy Policy.